What the capital is for

Toward: Build and deliver the first ten benches

Illustrative estimate
  1. 01

    Track saw and orbital sander

    Stop borrowing the two tools that matter

    25% of plan
    $1,250
  2. 02

    Shared workshop bench, 3 months

    A place to work with dust extraction

    29% of plan
    $1,500
  3. 03

    Reclaimed timber lot

    Second gym floor, delivered

    27% of plan
    $1,400
  4. 04

    Finishing oils and hardware

    Ten benches worth

    9% of plan
    $450
  5. 05

    Local delivery

    Van hire for ten drops

    10% of plan
    $500

Estimated total

The cost of reaching the First Goal. Bars show each item’s share of this estimate, not money raised or spent.

$5,100

Illustrative estimate. Coverage of any difference is declared by the Builder and not verified.